On January 15, 2026, LiFT Power Ltd reported results from the 2025 work program completed at the Yellowknife Lithium Project (“YLP”), located outside the city of Yellowknife, Northwest Territories (Figure 1) in Canada.
The 2025 YLP work program comprised 18 drill holes totalling 3,171 m, including six holes (2,378 m) for purposes of resource delineation, three holes (546 m) for geotechnical studies, and nine groundwater monitoring wells totalling 247 m. This news release summarizes results from the five resource holes drilled at the Shorty pegmatite as well as one of the groundwater wells.
Full details available in the Li-FT Announcement – January 15, 2026

